Start a new topic

How does the Tugger module address trips which request overutilized volume?

The tugger tab is where you specify the volume available on each tugger delivery.  This volume value is used for reporting if a trip (route at a specific time) is over or underutilized but is not used as a constraint in assigning a delivery to a specific tugger route.  It is the responsibility of the user to evaluate tugger volume utilization to address how routes can be (re)-defined to fit within the factory's requested delivery schedule.


It is the assumption of the application that requested deliveries at a specific time are not something that can be delayed beyond the user-specified tugger route frequency.

Login or Signup to post a comment